top of page
NEKA_hv-diganosttics-service
Search

Keep the factory up and running with online PD testing!

  • TW
  • Sep 23, 2022
  • 1 min read

Updated: Sep 25, 2022

During a resent Online PD survey NEKA successfully PD tested approx. 250 single-core cables with associated terminations. The survey took less than 2 days on site and revealed insulation failures with PD in a number of terminations.


By revealing and locating these errors, measures can now be planned and carried out at the next shutdown, preventing expensive unplanned breakdowns!


All we need to carry out this type of test is access to cable (cable jacket) near the termination, e.g cable basment. No service interruption during test!



The PD test may also be conducted remote with only local personell on site.

Our test engineers will perform the measurements over 4G. All you need to do on site is to temporarily attach the PD sensors to the relevant cables.





More info at:




 
 
 

Comments


Olje boretårn
Contact 
+47 95232799
post@neka.no
  • LinkedIn

© 2020 NEKA

Images from Unsplash, PryCam, B2 electronic, Wirescan, onsite hv group

bottom of page