top of page
INCREASES
RELIABILITY IN YOUR
MV & HV ASSETS
2014
>5000
>1000
>80
Year Established
PD measurements
Cables tested
Failures prevented
ABOUT
NEKA specializes in testing and residual life assessment on critical components in the high-voltage grid.
Our services identify and locate weaknesses in critical infrastructure and lay the foundation for maintenance optimization.
We perform commissioning and condition assessment on systems 6,3-420 kV.
Our services help to:
-
Residual assessment on MV/HV cable systems
-
Reduce costs
-
Minimize the likelihood of failures
-
Minimize downtime and maximize operating time
-
Increase the reliability, safety and longevity
-
Extended lifetime of the system
ABOUT
SERVICES
CLIENTS
CLIENTS & PARTNERS
Studies
CABLE DIAGNOSTICS
PARTIAL DISCHARGE (PD) & TANDELTA (TD)
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
More information or quote
Send us an email and we will get in touch
KONTAKT
bottom of page